PEB

Modern cold storage construction technology replaces RCC work with Pre Engineered Building Technology. Primarily it is steel structure with customized design fabricated at factory and shipped to site.

Why PEB Solutions?
• Such buildings are detailed and designed in advance and manufactured in a quality controlled environment.
• Every manufacturing operation is carried out through advanced technologies such as sophisticated welding techniques, standardization of components, etc.
• Pre engineered construction system also facilitates mass production.
• The construction is faster than the conventional method.
• Such buildings are detailed and designed in advance and manufactured in a quality controlled environment.

Comparison PEB V/S Conventional:

PEB Buildings
• Aesthetically appealing appearance
• Reduced time because of international design standards & codes using standard sections and connections
• Higher resistance to seismic forces due to low weight flexible frames
• 30% less PEB steel structures weight through efficient use of steel
• Factory controlled quality
• Lower initial cost of PEB steel buildings (cost per square meter about 30% less than the conventional) and faster delivery
• Simple Foundation, easy to construct and light weight of PEB structures
• Span size may be designed up to 40m
• Average delivery time 6-8 weeks

Conventional Building
• Special aesthetic design required
• Increased design time due to scratch and availability of less design aids
• Rigid heavy weight structures not suitable for seismic zones
• High weight due to excessive safety factor and heavy RCC work.
• Every project to be fabricated at site
• Special design and features developed for each project at higher costs
• Extensive heavy foundation
•Span size with limitation of beam width may be limited to 10-15m
• Average delivery time 22-28 weeks

top